Skip to main content
Uncategorized

Talk Talk Tests Condition Manager

By 13th July 2011November 5th, 2019No Comments

Following on from last year’s initial trial of the system by the Co-operative Group, Asset Handling has now deployed an additional 22 second generation AH-21 units across the Groups Critical Data centres in Phase 1 of a 41 unit rollout plan.

The live condition monitoring devices are now monitoring the Co-operative’s Datacentres critical assets and remaining single points of failure within their cooling and power trains. Each of the devices have been configured with our bespoke escalation plans to alert the engineering teams should any deviation from their normal operating parameters occur.